Sunday, November 17, 2024
Custom Text
Home NEWS BREAKING: NLC shuts down national grid, throws nation into total blackout

BREAKING: NLC shuts down national grid, throws nation into total blackout

-

By Jude-Ken Ojinnaka

In compliance with the joint directive of the Nigeria Labour Congress (NLC) and Trade Union Congress (TUC) to stop work on Monday June 3 over the new minimum wage, electricity workers have shut down the National Grid, resulting in nationwide blackout.

This ugly development was disclosed by the Transmission Company of Nigeria (TCN) in a statement signed by its spokesperson, Ndidi Mbah, on Monday morning.

TCN said workers were driven away from their duty posts while others were beaten and wounded at some power facilities. It added that all its efforts at national grid recovery were being frustrated by the unionists.

- Advertisement -

“The Transmission Company of Nigeria hereby informs the general public that the Labour Union has shut down the national grid, resulting in black out nationwide. The national grid shut down occured at about 2.19am this morning, 3rd June 2024.

“At about 1:15am this morning, the Benin Transmission Operator under the Independent System Operations unit of TCN reported that all operators were driven away from the control room and that staff that resisted were beaten while some were wounded in the course of forcing them out of the control room and without any form of control or supervision, the Benin Area Control Center was brought to zero.

“Other transmission substations that were shut down, by the Labour Union include the Ganmo, Benin, Ayede, Olorunsogo, Akangba and Osogbo Transmission Substations. Some transmission lines were equally opened due to the ongoing activities of the labour union.

“On the power generating side, power generating units from different generating stations were forced to shut down some units of their generating plants, the Jebba Generating Station was forced to shut down one of its generating units while three others in the same substation subsequently shut down on very high frequency. The sudden forced load cuts led to high frequency and system instability, which eventually shut down the national grid at 2:19am.

“At about 3.23am, however, TCN commenced grid recovery, using the Shiroro Substation to attempt to feed the transmission lines supplying bulk electricity to the Katampe Transmission Substation. The situation is such that the labour Union is still obstructing grid recovery nationwide.

- Advertisement -

“We will continue to make effort to recover and stabilize the grid to enable the restoration of normal bulk transmission of electricity to distribution load centres nationwide,” TCN stated.

Must Read

Ondo Poll: Tinubu hails Aiyedatiwa, urges aggrieved candidates to go to...

0
President Bola Tinubu on Sunday congratulated Governor Lucky Aiyedatiwa on his electoral victory in the just concluded Ondo...